Author: Shahzuma Warakhwala

Feasibility study of wastewater energy transfer for an existing campus building cluster

The HVAC-related energy usage of a group of three existing buildings on a Canadian university campus (the “Cluster”) was simulated. Two scenarios were compared: (1) an ambient loop paired with conventional HVAC equipment (boiler plant and cooling tower), and (2) an ambient loop using wastewater energy transfer (“WET”). The study aimed to assess the feasibility of implementing WET as a heating and cooling method for cold-climate institutional buildings, as well as to measure the effects of WET implementation on energy usage, greenhouse gas emissions, and energy costs

Read More
Vine intervention

Vine intervention

It’s like a jungle sometimes, but is the grass always greener for buildings that boast green walls and roofs? Laura Timberlake explores.

Matters of the heart

Matters of the heart

The adoption of a prefabrication strategy in the design and construction of mechanical services systems at the new Victorian Heart Hospital in Clayton solved numerous challenges associated with the build and project timelines. As Sean McGowan reports, the approach is a precursor to future healthcare projects.

Evan alrighty

Evan alrighty

Perth-based Evan Pratt, Affil.AIRAH, is residential HVAC project engineer and estimator for Consolidated Energy.

Royal Ciara

Royal Ciara

Mitsubishi Heavy Industries Air-Conditioners Australia (MHIAA) has announced the launch of its innovative Ciara compact wall-mounted split system, complete with built in wi-fi control.

Tall timber

Tall timber

Designed by Elenberg Fraser 6 Charles Street, or C6, has been and is being developed by Grange Development. It primarily consists of residential apartments, although the plans also include a 500m2 edible rooftop garden and dining and entertainment spaces. Residents will also have access to a car-share scheme that includes 80 Tesla electric vehicles.

Fairair

Advertisement